havgrizfan said:Nope, Everett didn't see that the BOR already finalized it. Don't read the Kaimin much. Thanks for the clue in. Your link didn't work, so what does it say about why the fall? Why not this summer?
Dude, it was huge news. It was in every paper. It was posted on this board a number of times.
I don't know why construction begins in the fall. My guess would be to minimize having two major construction areas in the same part of campus at the same time. But it may be due to the contractor's schedule. No idea. But your post was so far from reality that it deserved a WTF.
http://missoulian.com/news/local/re...cle_ababe119-a364-5ad5-b9c4-a89c22397ea1.html